Basic engineering design and optimization in thermal plants

Clean Energy’s engineering team has considerable experience in the calculation of the main equipment and balance of plant of thermal installations. State of the art thermal cycle calculation tools are used for this task.

Based on the obtained basic engineering design Clean Energy can further prescribe all required components of the under development plant to be included in a tendering procedure.

 

References